See it before you build it.
Three conceptual explorers built to show how the trade-offs move. Every number lists its assumptions — and what it ignores.
See the depth trade-off in seconds.
Drag a span and choose a floor system. The depth moves with you. It won't design anything — it'll show you which system leaves you headroom and which one quietly costs you a storey.
WHAT THIS DOES — AND DOESN'T — DO
See the carbon before you pour it.
Structure is where a building's embodied carbon is won or lost. Choose a system and size a building — we'll estimate its structural embodied carbon (A1–A3) against a concrete baseline, live.
WHAT THIS DOES — AND DOESN'T — DO
Six systems, ten criteria, one score.
Rate each system 1 (worst) to 5 (best) per criterion, switch criteria on or off, weight the ones that matter, and add a cost rating. Defaults are Sense's engineering view for a Metro Vancouver site — edit anything.
Every option sits on the same base: a reinforced-concrete podium at Level 1 over one level of parking basement. Only the structure above the podium changes, so the ratings compare the upper floors and how they load the podium, foundations and basement box.
Ranking
The matrix
|
Criterion · weight
|
|---|
How high can each system go in BC?
| Construction | Storey / height limit | Encapsulation required | Timber that may stay exposed | Also note |
|---|---|---|---|---|
| Light wood framecombustible construction · Art. 3.2.2.50 (C) / 3.2.2.58 (D) | 6 storeys and 18 m to the top floor | Rated gypsum assemblies throughout (typically 1 h floors and walls) | None — structure is concealed | Sprinklered; limits on combustible cladding and building area per storey |
| EMTC, 0-min tierTable 3.2.2.93 | 8 storeys / 34 m (Group C) · 9 storeys / 38 m (Group D) | None on suites; 25 min (1 × 12.7 mm Type X) in corridors, exits and shafts; concealed spaces protected | Walls, ceilings, beams and columns | New in 2024 — the tier most 6–8 storey podium schemes fall in |
| EMTC, 50-min tierArt. 3.2.2.48 (C) / 3.2.2.57 (D) · 3.1.6.4 | 12 storeys / 42 m | 50 min = 2 × 12.7 mm Type X (or 38 mm topping on the floor top) | Beams, columns and walls up to 35 % of the suite's perimeter wall area; ceilings 10 % (FSR ≤ 150) or 25 % (FSR ≤ 75); a fully exposed ceiling if beams/columns ≤ 20 % and walls are fully encapsulated | Combustible cladding limited to small, separated areas |
| EMTC, 70-min tierTable 3.2.2.93 · 3.1.6.4.(9) · 3.1.6.9 | 18 storeys / 76 m (Groups C and D) | 70 min = 2 × 15.9 mm Type X on all timber; 50 min allowed on the top side of floors | None | Non-combustible cladding above 12 storeys; stair and elevator shafts above 55 m in EMTC or concrete |
| Non-combustibleconcrete, structural steel, steel stud | No storey cap | Inherent ratings (concrete) or fire protection on steel (spray, intumescent, gypsum boxing) | n/a — steel columns in the hybrids still need their own protection | High-building provisions (3.2.6) once the top floor is above 18 m (Group C) or 36 m (Group D; 18 m where the exit-width test in 3.2.6.1 fails) |
EMTC = encapsulated mass timber construction. Storeys are counted above grade, so the parking basement does not count but the podium level does. Every EMTC building must be sprinklered and floors carry a 2-hour fire-resistance rating. Steel columns or steel-stud walls used with CLT floors are non-combustible construction and may be combined with EMTC in the same building (3.2.2.93.(2)). Confirm the applicable edition, occupancy mix and any alternative solutions with the authority having jurisdiction and a code consultant before relying on these tiers.
- B.C. builders can now use mass timber in taller buildings — BC Gov News, 10 April 2024
- BC Building Code 2024 Revision 1 — EMTC code change convenience copy (Table 3.2.2.93, Articles 3.1.6.4–3.1.6.9)
- AIBC — BC Codes update for mass timber construction
- City of Vancouver — Vancouver Building By-law 2025
- City of Vancouver — Embodied Carbon Guidelines (VBBL reduction targets)
- BC Mass Timber Demonstration Program
- NRCan — Green Construction through Wood (GCWood) program
WHAT THIS DOES — AND DOESN'T — DO
Every figure, referenced.
The estimators on this page use published, reputable benchmarks and code values. Here's exactly where they come from.
- [1] Institution of Structural Engineers (IStructE), How to Calculate Embodied Carbon (2nd ed.); and LETI, Embodied Carbon Primer — methodology and benchmark A1–A3 intensities for structural materials.
- [2] Peer-reviewed life-cycle assessments comparing mass-timber and concrete structures — reported embodied-carbon reductions of ~20–60% (e.g. systematic reviews in Sustainability / Buildings, MDPI; USDA Forest Products Laboratory comparative LCA).
- [3] Canam — LSD composite steel deck data sheets P-3606 / P-3615 and P-2432 (unshored spans and slab weights), used for the composite floor.
- [4] AISC Shapes Database v16.0 (metric W-section properties, matched to CISC designations and spot-checked against the CISC Handbook).
- [5] Kalesnikoff CLT 5-ply layup (APA PR-L332(C)), via Timber Navigator; and StructurePoint's CSA A23.3-14 worked examples (flat plate, flat slab with drop panels), which the concrete punching checks reproduce.
- [6] National Building Code of Canada 2020 (NRC) and CSA O86:24 / S16-19 / A23.3-19 (CSA Group) — loads, load combinations, L/360 and L/240 deflection limits, and design of timber, steel and concrete members.
- [7] U.S. Environmental Protection Agency — Greenhouse Gas Equivalencies Calculator (4.6 tCO₂e per typical passenger vehicle per year), used for the "cars off the road" comparison.
- [8] University of Bath — Inventory of Carbon & Energy (ICE) database, embodied-carbon factors.
- [9] Institution of Structural Engineers (IStructE), Carbon footprint benchmarking data for buildings, The Structural Engineer (2020) — frame capital carbon 145–170 kgCO₂e/m² at three storeys rising to 205–235 at fifteen (approx. +5 kgCO₂e/m² per storey); structure-only range 100–600 kgCO₂e/m², whole building 350–800.
Cost figures are indicative early-stage benchmarks and vary by market — not a quotation.