Feasibility tools · Interactive

See it before you build it.

Three conceptual explorers built to show how the trade-offs move. Every number lists its assumptions — and what it ignores.

See the depth trade-off in seconds.

Drag a span and choose a floor system. The depth moves with you. It won't design anything — it'll show you which system leaves you headroom and which one quietly costs you a storey.

Start from a building type
Grid spacing X (clear span)8.0 m
Grid spacing Y (bay width)8.0 m
Occupancy loadStandard office
Floor system
Structural depth
—
Floor-to-floor
—
Deflection limit
—

WHAT THIS DOES — AND DOESN'T — DO
Each floor is sized to Canadian codes by Sense Engineering's floor-depth engines, not a span/depth ratio: glulam beams to CSA O86:24 (24f-E D.Fir-L), steel W-sections to CSA S16-19 (non-composite under the CLT, or composite with a Canam steel deck), and a concrete slab on columns to CSA A23.3-19 (flat plate, drop panels or post-tensioned) [3][4][5][6]. Loads: finishes and services 0.5 kPa plus partitions 1.0 kPa, live load 1.9 / 2.4 / 4.8 kPa, combined as 1.25D + 1.5L and 1.4D [6]. Structural depth is the deepest member. For glulam and steel W-section w/ CLT it is the beam alone: the CLT deck and 50 mm topping sit on top, add their self-weight, and count in floor-to-floor so all four systems compare like-for-like. For the composite floor it is the slab plus the deepest beam; for concrete, the slab, plus the drop panel at the columns where one is used. Floor-to-floor assumes a 2.6 m clear height and a 400 mm services zone, with services running inline (between the downstand beams, or between the drops), so the zone is the greater of the two, not the sum. Every system is drawn to one scale. Glulam is sized without a fire rating; steel assumes applied fire protection. Not checked: floor vibration (steel, W-section w/ CLT and glulam), connections, and corner columns. A feasibility sketch, not a design. See Basis & sources ↓
Basis & sources

Every figure, referenced.

The estimators on this page use published, reputable benchmarks and code values. Here's exactly where they come from.

  1. [1] Institution of Structural Engineers (IStructE), How to Calculate Embodied Carbon (2nd ed.); and LETI, Embodied Carbon Primer — methodology and benchmark A1–A3 intensities for structural materials.
  2. [2] Peer-reviewed life-cycle assessments comparing mass-timber and concrete structures — reported embodied-carbon reductions of ~20–60% (e.g. systematic reviews in Sustainability / Buildings, MDPI; USDA Forest Products Laboratory comparative LCA).
  3. [3] Canam — LSD composite steel deck data sheets P-3606 / P-3615 and P-2432 (unshored spans and slab weights), used for the composite floor.
  4. [4] AISC Shapes Database v16.0 (metric W-section properties, matched to CISC designations and spot-checked against the CISC Handbook).
  5. [5] Kalesnikoff CLT 5-ply layup (APA PR-L332(C)), via Timber Navigator; and StructurePoint's CSA A23.3-14 worked examples (flat plate, flat slab with drop panels), which the concrete punching checks reproduce.
  6. [6] National Building Code of Canada 2020 (NRC) and CSA O86:24 / S16-19 / A23.3-19 (CSA Group) — loads, load combinations, L/360 and L/240 deflection limits, and design of timber, steel and concrete members.
  7. [7] U.S. Environmental Protection Agency — Greenhouse Gas Equivalencies Calculator (4.6 tCO₂e per typical passenger vehicle per year), used for the "cars off the road" comparison.
  8. [8] University of Bath — Inventory of Carbon & Energy (ICE) database, embodied-carbon factors.
  9. [9] Institution of Structural Engineers (IStructE), Carbon footprint benchmarking data for buildings, The Structural Engineer (2020) — frame capital carbon 145–170 kgCO₂e/m² at three storeys rising to 205–235 at fifteen (approx. +5 kgCO₂e/m² per storey); structure-only range 100–600 kgCO₂e/m², whole building 350–800.

Cost figures are indicative early-stage benchmarks and vary by market — not a quotation.